Skip to Main Content

Seavue Roof 2017/2018 Progress Photos

Tapered layers of foam from top of parapet to drain

Membrane draped over the parapet and sealed with metal fascia.

New Dryer Vents Installed.


3 Center Drains

Three 4 inch center drains

Completed drain

Crickets

The flow of water moves from the tapered parapets walls down to the crickets and on to one of the 3 drains.

Northside looking West, completed roof and fascia; all old drains disconnected, no water off of roof.